dataset-item - CPA

43.12.11 - Soil and land preparation works; clearance works

This subcategory includes: - preparation works for agricultural land - preparation works for making sites ready for subsequent construction works, including blasting and rock removal works - preparation works for mining: overburden removal and other development and preparation works of mineral properties and sites, including tunnelling, except for oil and gas extraction - site clearance, clearance of undergrowth - soil stabilisation - horizontal drillings for the passage of cables or drainpipes - digging of trenches for site drainage

Core content note

This subcategory includes: - preparation works for agricultural land - preparation works for making sites ready for subsequent construction works, including blasting and rock removal works - preparation works for mining: overburden removal and other development and preparation works of mineral properties and sites, including tunnelling, except for oil and gas extraction - site clearance, clearance of undergrowth - soil stabilisation - horizontal drillings for the passage of cables or drainpipes - digging of trenches for site drainage

Exclusion note

This subcategory excludes: - drilling services incidental to petroleum and natural gas extraction, see 09.10.11 - water well drilling, see 42.21.24

In scheme

CPA / 2014

Broader

43.12.1

Available formats

Representations of this data are also available in the following encodings:

About RAMON-LD

RAMON-LD is an experimental Linked Data implementation of the EUROSTAT RAMON registry.

For more information: RAMON-LD @ GitHub

This data is published under a CC-BY 4.0 licence.